Gallery: Large facade restoration projects, London
The gallery on this page shows a selection of work by London Architectural Stonemasonry. We’re a specialist facade contractor working across London and the South East on commercial, residential, and historic listed buildings.
Contact us to discuss your project.
We offer facade surveys and inspections, facade restoration, stone restoration and stone carving, brickwork restoration, leadwork, roofing and rainwater systems, decoration, and ongoing facade maintenance programmes. We work as both main and sub-contractor, alongside architects, surveyors, structural engineers, main contractors, managing agents, and building owners.
Projects in this gallery include
- 103 Farringdon Road, Clerkenwell, EC1. A complete new storey added to a Victorian commercial building. We replicated the facade below, with Portland stone sills, reclaimed brick arches cut to match the fan of the originals, cast iron mullions etc. Built off new steelwork we lifted in. We finished on site in three weeks.
- 12 Fortis Green Road, Muswell Hill, N10. Full restoration of a decayed Victorian stone bay elevation, cornice and parapet, including hand-carved sandstone string courses and ashlar replacements bedded in lime mortar, new structural steel support to the bay and parapet, and renewed lead work.
- 6-8 Talbot Road, Bayswater, W2. Full restoration of Grade II listed Victorian stucco terraces in Bayswater, including the rebuild of three severely neglected chimney stacks, balcony concrete repairs, bespoke rear staircase replacement, and facade redecoration.
- The Conrad London St James Hotel, Westminster. Four-month external refurbishment of a luxury hotel near Westminster, repairing crumbling pilasters, replacing string course stone and leadwork.
- Menier Chocolate Factory, Southwark, SE1. Full facade restoration of the Grade II listed Victorian chocolate factory on O’Meara Street, including hand-carved Bath stone dressings, lime repointing, brickwork repairs, and sash window restoration.
- Brentford Library, Boston Manor Road, TW8. Restoration of the terracotta and faience entrance portico of the Grade II listed Carnegie library in Brentford, removing decades of incorrect pointing that had stained and damaged the carved lettering.
- Christ Church, Highbury Grove, N5. Restoration of Gothic Revival stonework to the entrance elevation of a Victorian Anglican church in Highbury, including carved door surrounds and decorative stone capitals.
- Commercial building, Maidenhead, Berkshire, SL6. Ten-week rebuild of seven failing gable ends on a Victorian commercial building in Maidenhead, with replacement coping and apex stones, reclaimed brickwork, and winter working protocols throughout.
- 111 Campden Hill Road, Notting Hill, W8. Full facade restoration of a late Victorian corner building at Notting Hill Gate. Our work included paint removal and DOFF steam cleaning, lime repointing with brick replacements, stone repairs to the window surrounds, a replacement parapet balustrade reproduced in cast stone, and redecoration of the stonework in breathable mineral paint. All completed in eight weeks.
- 84 Great Portland Street, Fitzrovia, W1. Specialist paint-attack removal and Portland stone facade restoration to a commercial elevation, including DOFF superheated steam cleaning and controlled mechanical restoration to lift deeply embedded red paint from the fascia, entrance and pavement without shadowing, completed in two weeks.
- 10 Buckingham Gate, Westminster, SW1E (Duchy of Cornwall). Full facade restoration of the Grade II listed Duchy of Cornwall office opposite Buckingham Palace, including removal of fifty-plus layers of paint, stucco repairs, balustrade replication, and the hand-carving of a replacement Prince of Wales feathers emblem.
- 47 Upper Grosvenor Street, Mayfair, W1. Technically demanding replacement of a 450kg cantilevered Portland stone balcony in Mayfair, requiring four months of bespoke structural steel design and a Hiab crane operation with road closures.
- Grade I listed mural, Sugar House Lane, Stratford, E15. Successful relocation of a Grade I listed painted mural in Stratford using a purpose-engineered steel frame and 100-tonne crane, a four-day operation that multiple other contractors had declared impossible.
- 63 Pall Mall, Westminster, SW1. External refurbishment of a commercial building on Pall Mall, replacing Portland stone balcony cladding, carrying out structural steel repairs, repointing, stone indents, and a full facade clean in time for a Christmas scaffolding deadline.
- 2 Margaret Street, Westminster, W1. Six-week restoration programme for the Langham Estate on a Victorian commercial building in Westminster, rebuilding two chimney stacks from scratch, replacing stone sills and damaged brickwork, and completing large-scale repointing.























